ADVERTISEMENT

All Access Exclusive

Full Video: How to Build Your Electric Brewery | Part 2

In this advanced course, learn how to build your own electrical panel box with a BCS to operate your electric brewery!

Karl Weiss Feb 1, 2017 - 1 min read

This video requires an All Access subscription to view

Please subscribe or login to continue.

Subscribe Login

Learn how to convert your propane system or build an electric system from the ground up! In part 2 of this video, you will learn how to:

  • Implement and operate a brewery control system (BCS) | 220V panel
  • Use a PID in place of the BCS
  • Wire your electric panel box
  • Track electrical flow through your panel box (both 220V & 110V lines)
  • Wire LEDs and switches in your new panel
  • Integrate BCS with electric panel box
  • Brew with electric!

This Article Requires an All Access Subscription

Subscribe today to access all of the premium brewing content available (including this article). With thousands of reviews, our subscribers call it "the perfect beer magazine" and "worth every penny." Your subscription is protected by a 100% money back guarantee.

ARTICLES FOR YOU